2016 |
|
|
|
|
|
Karl-Treutel Schule Kelsterbach
Plus energy building storing / feeding energy from / to the grid. Transient thermal simulation; Energy Design; primary energy balances; controlling co... more
Client: Stadt Kelsterbach Architect: kplan AG, Abensberg |
|
|
2015 |
|
|
|
|
|
Control strategies Koehler Paper AG
Control strategies for a huge naturally ventilated paper storage building; control diagrams
Client: Papierfabrik August Koehler AG, 77704 Oberkirch |
|
|
|
|
Botanical Institute, KIT Karlsruhe
Preliminary study concerning the energy design; transient thermal simulation; attainable primary energy balance; own-consumption ratio of a large PV p... more
Client: Karlsruher Institut für Technologie (KIT) |
|
|
|
|
|
|
Hotel Lange Straße 100, Baden-Baden*
Transient Thermal Simulation for five thermal zones; analysis of heating and cooling load and transient thermal behaviour of the hotel rooms
Client: Lange Straße 100 GmbH & CO. KG |
|
|
2014 |
|
|
|
|
|
First Immo, Villa Alarobia, Madagaskar*
Transient Thermal Simulation;
Energy Design;
Building Physics Consulting
Client: First Immo Architect: architecture Otmar Dodel |
|
|
|
|
City-Haus 1, DZ-Bank Frankfurt*
Transient Thermal Simulation;
Energy Design;
Building Physics Consulting;
Architect: Architekten Theiss, Frankfurt |
|
|
|
|